Description
Transportation through a Section between Tangerang and Merak tollway on Km 57 - 59, was disconnected due to flooded river on Sunday January 15, 2012. This tollway is important as a connection to the ferry port in Merak that connect island of Java with Sumatra. 500 m of the tollway was flooded with maximum inundation up to 1.2 m depth due to Ciujung River flooding
Detail Event
- inundated area
- fill value here
- max flow depth
- fill value here
- max inundated distance
- fill value here
URL News
- No News Link
URL Videos
- No Video Link
Supported Files
- No Files
No Images
Highest Impact
0
Dead
0
Missing
0
Injured
0
Affected Person
0
Displaced