Affected Area/s
- Seluma
Floods in Kab. Seluma, Prov. Bengkulu Update: Thursday, 08 October 2020 Pkl. 16.20 WIB Chronology: • Due to high intensity rain since Monday, 05 October 2020, Pkl. 15.00 WIB up to. 22.00 WIB • There was a follow-up flood on Thursday, 08 October 2020, Pkl. 04.00 WIB Location: Kec. Ulu Talo Ds. Cloudy water Kec. Talo Ds. Lubuk Gio Ds. Estuary Lake Ds. Flower Sri Ds. Transverse Nepal Kec. Seluma Ex. Latitude Ex. Nepal Kec. Ilir Talo Ds. Penago 1 Kec. Seluma south Ds. Sukarami Kec. Ulu Talo Ds. Cloudy water *Impact: Fatalities : • 82 families / 558 people affected • 225 people fled to relatives homes Material Disadvantages: • 60 housing units (RR) • 22 housing units (RB) • 1 unit of Educational Facility (RR) • 5 Public Facilities (RR) • 2 units of public facilities (RS) • 4 units of Public Facilities (RB) • TMA 30 - 60 cm Effort : • TRC BPBD Kab. Seluma is still coordinating with local village officials and related agencies for flood management • TRC BPBD Kab. Seluma has provided assistance in the form of mineral water, sardines, rice, instant noodles and cooking oil through the local village head • Dinsos has established 2 refugee posts Current Condition: Thursday, 08 October 2020, Pkl. 13:15 WIB • Sunny weather, puddle still 30-60 cm high Source: Pusdalops BPBD Kab. Seluma Update on Tuesday, 6 October 2020, at 02.53 pm. Chronology: Rain with high intensity since Monday, 5 October 2020, from 03.00 pm to 10.00 pm. Casualties: 38 families/494 persons evacuated at 2 evacuation points. Material losses: 118 housing units slightly damaged. 22 housing units heavily damaged. 1 unit of education facility slightly damaged. 5 units of public facilities slightly damaged. 3 units of public facilities heavily damaged. The water level is 1-1.5 meters. Latest situation: The water has receded. 3 broken bridges have not yet passed by vehicles. By, TIM I Pusdalops BNPB Cc. Ess. 1 Update on 5 October 2020. Chronology: Rain with high intensity caused a flood in Seluma District of Bengkulu Province on Monday, 5 October 2020, from 03.00 pm to 10.00 pm. Location: Seluma District Ulu Talo Sub-District Air Keruh Village Casualties: 525 persons affected. Material losses: 1 unit of suspension bridge connecting villages is cut off. Effort: Rapid Response Team (Tim Respon Cepat/TCR) of Seluma District Management Agency (BPBD) is coordinating with village apparatus and related officials in responding to the flood. Challenge: Phone network at the incident location is poor hampering the coordination effort. Latest situation: - Water in the settlement has not receded. - Water inundated 20-60 cm. Source: Pusdalops Kab. Seluma By, Tim Piket Pusdalops BNPB Cc Ess. 1
Dead
Missing
Injured
Affected Person
Displaced