Description
Update on Friday, 9 October 2020, at 17.00 WIB. Chronology: Rain with high intensity caused flood on Thursday, 8 October 2020, at 17.00 WITA. Location: Messawa Subdistrict. Rippung Village. Casualty: -68 families isolated. -21 families exposed. Material loss: -21 housing units exposed. -1 point of national road was cut off and rice fields were damaged (still under data collection). -1 unit of irrigation dam was heavily damaged. -Tombang Bye bridge was cut off. -Some points of irrigation channels were broken. Effort: -TRC of BPBD Mamasa District is still collecting data and coordinating with National Planning & Supervision of Road and Bridge (P2JJ) to fix broken road and bridge. -TRC of BPBD Mamasa District, together with the local community, are cleaning up mud dropped on the road. Latest situation: -Light rain. -The bridge is still cut off, vehicles still cannot cross the bridge. Source: Mr. Pasambon, Head of Rehabilitation & Reconstruction (RR) Division of BPBD Mamasa District. By, Tim Piket Pusdalops BNPB cc. Ess. 1
Detail Event
- inundated area
- fill value here
- max flow depth
- fill value here
- max inundated distance
- fill value here
URL News
- No News Link
URL Videos
- No Video Link
Supported Files
- No Files
No Images
Highest Impact
0
Dead
0
Missing
0
Injured
340
Affected Person
0
Displaced